Bricks - On The Roof
7/5/00 - 7/24/00
7/5/00
Smitty is rigging up a hoist with which we will be able to lift materials to the roof.  He's also constructing a work platform.
7/5/00
The rope will go from the front of his truck, through a pulley at the base of the house and up through a pulley on that rig
he's building and straight back down to where we'll lift things from.  Backing the truck up will lift things up to the deck on the
roof.
<-- 7/5/00
Smitty's scaffold to finish the chimney
(John from next door looking on)

7/6/00 -->
Hole in roof @ chimney at level of
ceiling (from south side towards peak
of roof)
7/6/00
Ground level view of Chris's truck and
wheelbarrow on derrick to roof
(Smitty, Chris, John)
7/6/00

<-- John (next door neighbor) checks
out the staging and hole in the roof for
the chimney

-->
Looking down at chimney from north
side
7/6/00
The rope from the roof
counterweighted so that it will come
back down when empty...
7/6/00
The rope from the roof hooked to the
wheelbarrow for lifting
7/7/00
A view of the set-up.  Work platform and shade canopy with hoist (empty hook hanging just left of the end of the shovel
handle in the left photo).  Follow the yellow rope, it's hooked to the front of my truck...
All engineered and executed by Smitty...  We all just watched...
7/7/00
Finally starting on the chimney above
the ceiling
(from the south side looking toward
peak of roof)
7/7/00
Smitty never looked so good...
Bringing flue tile up...
Conduit for cables to chimney-top
dampers
Lift in the up position (truck back).  My
work station.  My job:  mix mud and
clean bricks and lean on my truck...
View from roof.  Chris mixing "mud".  Notice ropes for derrick which is attached
to truck (lower right) for power
7/7/00

<--
A load of stuff going down...

-->
Looking down the flues beside the
conduit for the dampers
And the derrick takes up mortar,
bricks, etc.
Under the radio and Smitty's hat on the
left side, you can see a 2x6 laying flat
on the roof.  There's another one on
the other side like that.  Those are the
only things attached to the roof.  
Everything else is suspended from
those 2x6s.
Smitty's staging for last stage of
chimney (Bricks are stacked by side of
hole for chimney at bottom left)
7/10/00
Coming up out of the roof...
7/11/00
Smitty finishing top of chimney
<--
7/11/00
Still working on chimney

-->
7/12/00
Last load of bricks going up
7/11/00
Last course of bricks before top of
chimney
7/12/00
Smitty ready to start cap on chimney
7/12/00
Last load of bricks to finish cap on
chimney
7/12/00
It's a beautiful day!
7/17/00
The cap (dampers) are on the chimney
top!
7/17/00

The dampers are in the up position.  
To close them, a cable is pulled by the
fireplace.  With the dampers on top of
the chimney, all the heat is held inside
the house and doesn't go, as they say,
"up the chimney".
7/17/00
Smitty admires his work
7/17/00
Chimney finished - taking down the
staging
7/17/00
Chimney finished, Smitty takes his
staging apart piece by piece
7/21/00
The finished product
7/20/00
And the roof is all back together
7/24/00
Masonry furnace finished (west side)
(Note kitchen being put together (rear
left)
7/24/00
Masonry furnace done (east side)